Office of Aviation Services Hangar
CRW provided civil and structural design for a new 20,000 sf aviation hangar and a 9,000 sf weather shelter hangar....
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/001-AE07-AB-Parking-Lake-Hood.jpg)
Lake Hood Alpha-Bravo
The Lake Hood Seaplane Base A and B general aviation aircraft parking areas were rehabilitated, including new asphalt surfacing over...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/001-AE06-RW-5-23-Lighting-Merrill-Field.jpg)
Merrill Field Runway 5-23 Lighting
This project provided runway lighting for the gravel/ski strip 5-23, edge lighting for Taxiways T and G, power regulator upgrades,...
VIEW PROJECT>
![Photo of Alaska Airlines Hanger](https://www.crweng.com/wp-content/uploads/2019/11/AAHangar.gif)
Alaska Airlines Hangar
Site and utility design were provided for the construction of a new, 60,000-square-foot maintenance hangar for Alaska Airlines. The site...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/001-AE04-Lakeshore-Taxilane-Ramp.jpg)
Lake Hood Lakeshore Taxilane
This project rehabilitated 1,900 feet of taxiway at Lake Hood Seaplane Base. The improvements included new pavement structural sections, ditching,...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/001-AE03-Merrill-Field-Anchorage.jpg)
Merrill Field Taxiways G & Q, Phases 5, 6 & 7
This fast-paced reconstruction of Taxiways G and Q and the Golf East and Quebec Aprons included new structural sections, pavement,...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/001-AE02-Taxiway-F-ANC.jpg)
Anchorage International Airport Taxiway F
Reconstructed to FAA standards, the Taxiway F improvements included a new structural section; shoulder paving; and the replacement of lighting,...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/001-AE01-Taxiway-Victor-ANC.jpg)
Lake Hood Taxiway V
These improvements brought Taxiway V into conformance with the Airport Layout Plan's ultimate designation and included structural section replacement, shoulder...
VIEW PROJECT>
![Photo of culvert backfilling and creek diversion.](https://www.crweng.com/wp-content/uploads/2023/03/Culvert-backfilling-and-creek-diversion.png)
Northern Lights Boulevard Chester Creek Culvert
The Chester Creek culvert underneath Northern Lights Blvd failed during the winter of 2020. As a fast paced, emergency repair...
VIEW PROJECT>
![Photo of pipes in Emmonak, AK.](https://www.crweng.com/wp-content/uploads/2023/03/DSCN6477-scaled.jpg)
Emmonak Water & Sewer System Improvements
Working directly for the City of Emmonak, CRW provided planning, surveying, design, permitting, and construction administration services for upgrades to...
VIEW PROJECT>
![Photo of wastewater lagoons in Rampart, AK.](https://www.crweng.com/wp-content/uploads/2023/03/IMG_2625-scaled.jpg)
Rampart Wastewater Lagoon Improvements
CRW provided construction administration services for wastewater lagoon upgrades in Rampart, Alaska. The project included the construction of a new...
VIEW PROJECT>
![Photo of Sitka critical secondary water project.](https://www.crweng.com/wp-content/uploads/2023/03/20220621_075322-scaled.jpg)
Sitka Critical Secondary Water Supply
CRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...
VIEW PROJECT>
![Quinhagak WS Project](https://www.crweng.com/wp-content/uploads/2019/11/014-WA05-Quinhagak-WS-Project.jpg)
Quinhagak Water & Sewer Project
This multi-year project included managing budgets, schedules, workforce, and procurement activities. Almost every type of utility construction project was involved:...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/SeldoviaWTP-scaled.gif)
Seldovia Water Treatment Plant
As the Engineer of Record, CRW provided years of construction management services. Tasks included managing budgets, schedules, workforce, and procurement...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/002-CA03-Merrill-Field-1.jpg)
Merrill Field Airport Capital Improvements
CRW provided construction administration and daily on-site field inspection services of the dynamic compaction of the old landfill below Merrill...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/ERWWT2.gif)
Eagle River Wastewater Treatment Facility Rehab – Phase II
Full-time construction management and on-site field inspection services were provided by CRW. Our personnel met daily with Anchorage Water and...
VIEW PROJECT>
![Photo of Eklutna Water Treatment Facility electrical panels.](https://www.crweng.com/wp-content/uploads/2023/03/003-EE03-EWTF-1-IMG_0305-scaled.jpg)
Eklutna Water Treatment Facility Upgrades
The entire 30-year-old primary electrical supply for the main water source was replaced preemptively before it became an emergency. The...
VIEW PROJECT>
![Photo of large electrical box in Sitka, AK](https://www.crweng.com/wp-content/uploads/2023/02/electrical_largeBox-scaled.jpg)
CITY & BOROUGH OF SITKA CRITICAL SECONDARY WATER SUPPLY PROJECT
This project included the design of a new water intake and 6 MGD water treatment plant (WTP). The new WTP...
VIEW PROJECT>
![CRW Engineering Group - C Street Phase 2 Photo](https://www.crweng.com/wp-content/uploads/2022/12/C-Street_Phase2.gif)
C Street Phase 2 Electrical Engineering
CRW provided the electrical engineering design for the C Street and 7th Avenue Transit Phase 2 project. The design included pedestrian light pole...
VIEW PROJECT>
![AWWU-PRV-Rehab](https://www.crweng.com/wp-content/uploads/2019/11/003-EE05-AWWU-PRV-Rehab-IMG_4176.jpg)
Anchorage Water & Wastewater Utility PRV Rehabilitation Projects
CRW prepared design documents to upgrade existing pressure reducing valve facilities for Anchorage Water and Wastewater Utility. Facility systems were...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/St-Marys-Wind.gif)
Bethel Wind Turbine
CRW was selected to design and permit a 900-kilowatt, grid-connected wind turbine in Bethel. Our responsibilities included the review and...
VIEW PROJECT>
![Seldovia-WTP](https://www.crweng.com/wp-content/uploads/2019/11/003-EE01-Seldovia-WTP-2-DSCN8843.jpg)
Seldovia Water Treatment Plant
Power, lighting, and controls were designed for a new greensand filtration system. The power feed was extended several thousand feet...
VIEW PROJECT>
![Palmer WWTP](https://www.crweng.com/wp-content/uploads/2019/11/010-SE03-Palmer-WWTP-MBBR-DSCN1658-e1576193650167.jpg)
Palmer Wastewater Treatment Plant
CRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...
VIEW PROJECT>
![Energy project in Togiak, AK](https://www.crweng.com/wp-content/uploads/2019/11/004-EN05-Togiak.jpg)
Togiak Energy System Upgrade
The existing, 30-year-old energy infrastructure had exceeded its useful design life. The power plant was replaced with a pre-engineered metal...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/StMarys.gif)
St. Mary’s Energy System Upgrade
This project includes planning, design, and construction support services for a new tank farm and power plant facility. The work...
VIEW PROJECT>
![project in Pilot-Station, AK](https://www.crweng.com/wp-content/uploads/2019/11/004-EN02-Pilot-Station.jpg)
Pilot Station Energy System Upgrade
Existing facilities were located on the bank of the Yukon River and subject to flooding. This multi-faceted project relocated the...
VIEW PROJECT>
![project in Teller, AK](https://www.crweng.com/wp-content/uploads/2019/11/004-EN01-Teller.jpg)
Teller Energy System Upgrade
A new modularized power plant with a heat recovery system and 110,000-gallon, bulk fuel tank farm were constructed on a...
VIEW PROJECT>
![Photo of Sitka critical secondary water project.](https://www.crweng.com/wp-content/uploads/2023/03/20220621_075322-scaled.jpg)
Sitka Critical Secondary Water Supply
CRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Arc-Village-River-scaled.gif)
Arctic Village Water Treatment Plant & Washeteria
CRW provided planning, a pilot study, and design for a new, fill and draw, water treatment plant and washeteria. The...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Mertarvik-scaled.gif)
Mertarvik Water & Sewer Design
The Mertarvik site is being constructed to relocate Newtok residents who are in danger of losing their community due to...
VIEW PROJECT>
![CRW Engineering Group Landfill Engineering & Design project in Alaska.](https://www.crweng.com/wp-content/uploads/2019/11/QuinLagoon.gif)
Quinhagak Water & Sewer Project
The services provided by CRW included analysis, testing, design, and construction of the community water source, consisting of three slant...
VIEW PROJECT>
![Napaskiak-WTP](https://www.crweng.com/wp-content/uploads/2019/11/005-EV02-Napaskiak-WTP.jpg)
Napaskiak Water Treatment Plant Upgrades
The public water utility treats water at two water treatment plants from two separate groundwater sources. To remove iron and...
VIEW PROJECT>
![Environmental-Water Testing and Analysis](https://www.crweng.com/wp-content/uploads/2019/10/Environmental-Water-Testing-and-Analysis.jpg)
Unalakleet Public Water System
The public water system contained elevated levels of organics and had limited capacity to meet summer water demands. Upgrades included...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/SeldoviaWTP3.gif)
Seldovia Water Treatment Plant
CRW completed the design, permitting, force account construction management, and start-up for a new water treatment plant, which treats the...
VIEW PROJECT>
![Photo of the People Center on JBER](https://www.crweng.com/wp-content/uploads/2022/02/PeopleCenter_Website.jpg)
US Army Corps of Engineers Joint Base Elmendorf Richardson (JBER) Building 8517 Earthquake Repair
This 160,000 square-foot, 1950’s “People Center” located at JBER, was damaged by the Alaska magnitude 7.1 November 2018 earthquake. Damages...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/02/GSA-Lukeville-Kennel.gif)
US Customs and Border Protection Canine Kennel
CRW provided structural, mechanical, electrical, and civil engineering services to assist the contractor in designing a new 10 kennel canine...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2021/12/Aeration-Basin.gif)
United States Coast Guard (USCG) Kodiak Wastewater Treatment Facility (WWTF)
This project involves two phases. The first phase evaluates existing wastewater treatment plant/process/operations and the lift stations conveying wastewater to...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2021/12/FAA-FBX-AFSS.gif)
Federal Aviation Administration Fairbanks Automated Flight Service Station (AFSS)
This project includes engineering design services for a new 40-foot by 30-foot, single-story metal building at the AFSS in Fairbanks,...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2021/12/Sparrevohn-web.gif)
United States Air Force (USAF) Sparrevohn Long Range Radar Site
CRW provided design, construction administration, and commissioning services for this design-build bulk fuel project for the USAF at the Sparrevohn...
VIEW PROJECT>
![Photo of CRW employee working on temporary bridge in Seward, AK](https://www.crweng.com/wp-content/uploads/2023/02/Seward_tempBridge.jpg)
Victor Creek Temporary Bridge
CRW provided axial and lateral pile design for a temporary bridge crossing Victor Creek as part of the Alaska Department...
VIEW PROJECT>
![Photo of CRW in Valdez, Alaska](https://www.crweng.com/wp-content/uploads/2023/02/Valdez_geotech.jpg)
Valdez Container Terminal (VCT) Water Main Replacement
CRW performed a geotechnical investigation to support CRW’s design for a replacement water main on the island and causeway. The...
VIEW PROJECT>
![Photo of UAA AV-Tech building](https://www.crweng.com/wp-content/uploads/2023/02/UAA_AV-TechBldg_earthquakeRepair.jpg)
UAA AV-Tech Building Earthquake Repairs
CRW provided geotechnical support throughout the investigation and design of building and apron repairs due to the November 2018 Alaska...
VIEW PROJECT>
![Photo of geotechnical work in Kotzebue, AK](https://www.crweng.com/wp-content/uploads/2023/02/KotzebueAC_Store_geotech.jpg)
Kotzebue AC Store
CRW performed a geotechnical investigation to support site development and foundation design for a new Alaska Commercial (AC) Store in...
VIEW PROJECT>
![Photo of backhoe in King Cove, AK](https://www.crweng.com/wp-content/uploads/2023/02/KingCoveSWSbackhoe.jpg)
King Cove Solid Waste Services
CRW performed a geotechnical investigation to support site development and design for a new solid waste processing facility in King...
VIEW PROJECT>
![Photo of plane on runway, CRW truck, and drilling equipment](https://www.crweng.com/wp-content/uploads/2023/01/GeotechHDD_ANC.jpg)
Geotechnical Investigation in Support of Horizontal Directional Drilling Design for a Private Development at ANC
CRW planned and oversaw a geotechnical investigation to support the design of a buried fuel pipeline to be installed by...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Rampart-Geo-1-scaled.gif)
Rampart Sewage Lagoon
A geotechnical investigation was performed to support CRW’s design of a new sewage lagoon for the community of Rampart. The...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Taxiway-Y-scaled.gif)
Anchorage International Airport Taxiway Y Slope Repair
CRW oversaw cone penetration testing (CPT) to investigate a shallow slide failure due to the November 2018, southcentral Alaska, magnitude...
VIEW PROJECT>
![Photo of 82nd Ave Pump Station](https://www.crweng.com/wp-content/uploads/2023/04/82nd-Ave-Pump-Station-scaled.jpg)
82nd Ave Pump Station
CRW provided project management, design, and construction support services for the design of the 82nd Avenue lift station. CRW services included...
VIEW PROJECT>
![Phot of Crawford St area lift station](https://www.crweng.com/wp-content/uploads/2023/04/10135-Crawford.jpg)
Crawford Street Area Drainage Improvements
Design of a replacement stormwater lift station, controls, and force main in West Anchorage, replacing a 30 year old existing...
VIEW PROJECT>
![Photo of culvert backfilling and creek diversion.](https://www.crweng.com/wp-content/uploads/2023/03/Culvert-backfilling-and-creek-diversion.png)
Northern Lights Boulevard Chester Creek Culvert
The Chester Creek culvert underneath Northern Lights Blvd failed during the winter of 2020. As a fast paced, emergency repair...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/OER-Culvert-3-Web-scaled.gif)
Meadow Creek at Old Eagle River Road
Continual flooding in this project area was due to an undersized culver. A larger box culvert was installed to pass...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/10/hydrology-e1576256135887.gif)
35th Avenue & McRae Road Improvements
CRW worked with the Municipality of Anchorage to upgrade this 4,000-foot-long, neighborhood collector roadway located in west Anchorage. The project...
VIEW PROJECT>
![Golden View Dr](https://www.crweng.com/wp-content/uploads/2019/11/015-WR03-Golden-View-Dr-10-6-19.jpg)
Golden View Drive Upgrade
Improvements to bring this two-mile-long section of hillside road to Municipality of Anchorage collector standards and provide a safer road...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/ChesterCreek-e1663011189711.gif)
Chester Creek Culvert Replacement at Providence Drive
Two existing 78-inch-diameter corrugated metal pipe culverts that conveyed fish passage of Chester Creek beneath Providence Drive were replaced with...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/015-WR01-Fish-Creek-Trail-IMG_5044-e1576113293462.jpg)
AMATS: Areawide Trails Rehab, Fish Creek Trail
Rehabilitation of this mile-long section of trail to improve safety and connectivity included replacement of four pedestrian bridges, installation of...
VIEW PROJECT>
![Photo of King Cove, AK](https://www.crweng.com/wp-content/uploads/2023/03/IMG_0836-scaled.jpg)
King Cove Solid Waste Processing Facility
CRW assisted the City of King Cove with a new Solid Waste Processing Facility. The project included surveying, developing an...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/12/msb-landfill-survey2.gif)
Matanuska-Susitna Borough Central Landfill Survey
Under term contract with the Matanuska-Susitna Borough, CRW is providing surveying services to support the Solid Waste Division’s operations at...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Eek-Landfill-scaled.gif)
Eek Landfill
Design and construction administration services were provided for a new Class III landfill facility and closure of the existing dump....
VIEW PROJECT>
![Photo of building in Huslia, AK.](https://www.crweng.com/wp-content/uploads/2023/03/BIOMASS-BOILER_CRW.jpg)
Biomass Boiler Design
CRW provided mechanical and electrical engineering design, which will serve multiple buildings. This extreme winter temperature design will provide an...
VIEW PROJECT>
![Photo of Mears Middle School](https://www.crweng.com/wp-content/uploads/2023/03/Mears-Displacement-MPR-After.jpeg)
Mears Middle School Roof Replacement
For this multi-phase renovation project CRW provided mechanical and electrical design and construction administration services to upgrade the roof and...
VIEW PROJECT>
![NSB Transit Wash Bay Water Recycle Reclaim](https://www.crweng.com/wp-content/uploads/2019/11/007-ME05-NSB-Transit-Wash-Bay-Water-Recycle-Reclaim.jpg)
North Slope Borough Transit Wash Bay Upgrade
CRW provided design services to incorporate a new bus wash, water recycle/reclaim system, and commercial vacuums into the existing wash...
VIEW PROJECT>
![Quinhagak-Utility-Building-Heat-Recovery-System](https://www.crweng.com/wp-content/uploads/2019/11/007-ME04-Quinhagak-Utility-Building-Heat-Recovery-System.jpg)
Heat Recovery Projects
CRW designed more than a dozen heat recovery projects for communities throughout western and interior Alaska. These heat recovery systems...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/PRV2-scaled.gif)
Anchorage Water & Wastewater Utility 92nd Avenue PRV Facility
Mechanical work for this new facility involved heating and ventilation, and layout of the 12-inch and 16-inch water piping and...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/USAFTanks.gif)
US Air Force Diesel Fuel Bulk Storage Replacement
This project included six, 37,500-gallon, aboveground storage tanks; an enclosure for fuel offloading; and a control building. Design of heating...
VIEW PROJECT>
![Rogers-Park-ES-Utility-Corridor](https://www.crweng.com/wp-content/uploads/2019/11/007-ME01-Rogers-Park-ES-Utility-Corridor.jpg)
Rogers Park Elementary School Roof & HVAC Upgrades
CRW co-primed this multi-phase renovation project, which included systems upgrades to the roof drainage, domestic piping, and HVAC to provide...
VIEW PROJECT>
![Palmer WWTP](https://www.crweng.com/wp-content/uploads/2019/11/010-SE03-Palmer-WWTP-MBBR-DSCN1658-e1576193650167.jpg)
Palmer Wastewater Treatment Plant
CRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/04/KivalinaArialView.png)
Kivalina Relocation Master Plan
CRW is preparing the community Master Plan for Kivalina in support of the community’s expansion to K-Hill. The Master Plan...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/04/Cordova.gif)
Native Village of Eyak (NVE) Housing Master Plan
CRW is assisting the NVE with the development of a Housing Master Plan in Cordova. The NVE and the City...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/04/MillionDollarBridge.png)
Department of Transportation & Public Facilities Copper River Highway Transportation Master Plan
CRW is supporting the Alaska Department of Transportation & Public Facilities (DOT&PF) and the Native Village of Eyak in developing...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/SeldoviaWTP3.gif)
Seldovia Water Treatment Plant
CRW completed the design, permitting, force account construction management, and start-up for a new water treatment plant, which treats the...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Eek-Landfill-scaled.gif)
Eek Landfill
Design and construction administration services were provided for a new Class III landfill facility and closure of the existing dump....
VIEW PROJECT>
![ATV-Super-Highway-Kipnuk](https://www.crweng.com/wp-content/uploads/2019/11/008-RI04-ATV-Super-Highway-Kipnuk.jpg)
Kipnuk Boardwalk Improvements
Many rural communities use extensive boardwalk networks for mobile transportation, especially during the summer and fall seasons when the moist...
VIEW PROJECT>
![Unalakleet Lagoon-Dredging Under Way](https://www.crweng.com/wp-content/uploads/2019/11/008-RI03-Unalakleet-Lagoon-Dredging-Under-Way.jpg)
Unalakleet Lagoon Rehabilitation
The project upgrades involved removing over 30 years of sludge buildup and installing two, 30,000-gallon septic tanks to limit future...
VIEW PROJECT>
![Rural Sanitation-Arctric Water and Sewer-Quinhagak](https://www.crweng.com/wp-content/uploads/2019/10/Rural-Sanitation-Arctric-Water-and-Sewer-Quinhagak-e1580939915132.jpg)
Quinhagak Piped Water & Sewer System
CRW has worked successfully for 17 years on sanitation and infrastructure improvements. The long-term goal is to develop sustainable facilities...
VIEW PROJECT>
![Arctic-Village-WTP](https://www.crweng.com/wp-content/uploads/2019/11/008-RI01-Arctic-Village-WTP.jpg)
Arctic Village Water Treatment Plant & Washeteria
CRW provided planning, design, permitting, surveying, and force account construction management services for a new water treatment plant and washeteria...
VIEW PROJECT>
![Photo of Medline warehouse.](https://www.crweng.com/wp-content/uploads/2023/03/DSCF6775-scaled.jpg)
Medline Warehouse
CRW provided survey, geotechnical, and civil design on this design-build project that involved construction of a 149,000 sf, multi-story warehouse on...
VIEW PROJECT>
![Photo of Prince William Sound Science Center in Cordova, AK.](https://www.crweng.com/wp-content/uploads/2023/03/Exterior-scaled.jpg)
Prince William Sound Science Center
CRW provided civil and structural engineering services for the Prince William Sound Science Center, consisting of a main building and...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2023/03/49671fe1-7464-415a-a6bd-51b889b6444b_cropped-scaled.jpg)
Office of Aviation Services Hangar
CRW provided civil and structural design for a new 20,000 sf aviation hangar and a 9,000 sf weather shelter hangar....
VIEW PROJECT>
![Huffman Elementary Aerial 8-24-11 01](https://www.crweng.com/wp-content/uploads/2019/11/009-SD06-Huffman-Elementary-Aerial-8-24-11-01.jpg)
Huffman Elementary School Upgrades
CRW developed an inspection checklist to assess existing site conditions and to assist with designing recommended improvements. Traffic circulation and...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/afs1-scaled.gif)
Anchorage Football Stadium Improvements
This project featured an innovative type of artificial turf surfacing that looks and plays like real grass, a new track...
VIEW PROJECT>
![Susitna Flats](https://www.crweng.com/wp-content/uploads/2019/11/009-SD03-Susitna-Flats.jpg)
Susitna Flats Housing
This multi-phase project began with determining the feasibility of developing the west end of the Park Strip. The site was...
VIEW PROJECT>
![Photo of Alaska Airlines Hanger](https://www.crweng.com/wp-content/uploads/2019/11/AAHangar.gif)
Alaska Airlines Hangar
Land surveying, civil, and site design were provided for a new Alaska Airlines hangar. The project successfully overcame the challenges...
VIEW PROJECT>
![MLnP Plant 2 - Anchorage](https://www.crweng.com/wp-content/uploads/2019/11/009-SD01-MLnP-Plant-2-Anchorage.jpg)
ML&P Plant 2 Expansion
Civil planning, design, and construction management services were provided on this design/build power plant expansion project, including surveying, retaining wall...
VIEW PROJECT>
![Photo of Aloft Hotel](https://www.crweng.com/wp-content/uploads/2023/01/AloftExterior.jpg)
Aloft Hotel
The new Aloft Hotel is Anchorage’s newest boutique hotel. The four-story, 146 room, wood framed hotel is approximately 80,300 square-foot...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/08/PWSSC_alt-e1661790663155.gif)
Prince William Sound Science Center
This fast-tracked, Design-Build project entailed design for a new two-story, 24,000 square-foot science center. Shortly after award in January of...
VIEW PROJECT>
![Photo of the People Center on JBER](https://www.crweng.com/wp-content/uploads/2022/02/PeopleCenter_Website.jpg)
US Army Corps of Engineers Joint Base Elmendorf Richardson (JBER) Building 8517 Earthquake Repair
This 160,000 square-foot, 1950’s “People Center” located at JBER, was damaged by the Alaska magnitude 7.1 November 2018 earthquake. Damages...
VIEW PROJECT>
![USAF Cape Newenham](https://www.crweng.com/wp-content/uploads/2019/11/010-SE04-USAF-Cape-Newenham-e1576193553429.jpg)
US Air Force Diesel Fuel Bulk Storage Replacement
Structural, civil, mechanical, and electrical engineering was provided for the replacement of an existing tank farm. The project consisted of...
VIEW PROJECT>
![Palmer WWTP](https://www.crweng.com/wp-content/uploads/2019/11/010-SE03-Palmer-WWTP-MBBR-DSCN1658-e1576193650167.jpg)
Palmer Wastewater Treatment Plant
CRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...
VIEW PROJECT>
![Water-Treatment-Plant-Arctic-Village](https://www.crweng.com/wp-content/uploads/2019/11/010-SE01-Water-Treatment-Plant-Arctic-Village.jpg)
Arctic Village Water Treatment Plant & Washeteria
CRW provided the structural and civil engineering, and process design for a new, 2,250-square-foot, water treatment facility and washeteria. The...
VIEW PROJECT>
![Computer-generated view of Shotgun Cove Road extension](https://www.crweng.com/wp-content/uploads/2022/11/ShotgunCove3.gif)
Shotgun Cove Road Extension
The City of Whittier plans to extend Shotgun Cove Road 2.5 miles from its current terminus to Forest Service lands at Trinity...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/09/VCT_Survey.gif)
Valdez Container Terminal Water Main Replacement
The Valdez Container Terminal is the state's fourth-largest port in terms of volume and plays a crucial role in serving the community...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/12/msb-landfill-survey2.gif)
Matanuska-Susitna Borough Central Landfill Survey
Under term contract with the Matanuska-Susitna Borough, CRW is providing surveying services to support the Solid Waste Division’s operations at...
VIEW PROJECT>
![Whittier City Park 3D Point Cloud](https://www.crweng.com/wp-content/uploads/2019/11/011-SV05-Whittier-City-Park-3D-Point-Cloud-e1576195791932.jpg)
Whittier City Park Master Plan, Unmanned Aerial Vehicle (UAV) 3D Modeling
Using a survey-grade Leica unmanned aerial vehicle, CRW provided high-resolution aerial photography and a 3D point cloud for the planning...
VIEW PROJECT>
![Kipnuk Boardwalks Vertical Control](https://www.crweng.com/wp-content/uploads/2019/11/011-SV04-Kipnuk-Boardwalks-Vertical-Control-e1576195622811.jpg)
Kipnuk Boardwalk Improvements Vertical Survey Control
CRW's survey group provided the survey control, topographic survey, and as-builts of the existing boardwalk and structures for the design...
VIEW PROJECT>
![Edna-Bay-Plat-Boundary-Survey](https://www.crweng.com/wp-content/uploads/2019/11/011-SV03-Edna-Bay-Plat-Boundary-Survey2-e1576195011692.jpg)
Alaska State Land Subdivision Plat Boundary Survey
Surveying, mapping, and platting were provided for bulk fuel storage tanks for the community of Edna Bay. The plat subdivided...
VIEW PROJECT>
![Pt-Woronzof-Hydro-Survey](https://www.crweng.com/wp-content/uploads/2019/11/011-SV02-Pt-Woronzof-Hydro-Survey.jpg)
Point Woronzof Wastewater Treatment Facility Hydrographic Survey
Due to tidal erosion around the Anchorage Water and Wastewater Utility effluent tower, a new erosion-control structure was constructed around...
VIEW PROJECT>
![AK-Airlines C-Terminal-ANC](https://www.crweng.com/wp-content/uploads/2019/11/011-SV01-AK-Airlines-C-Terminal-ANC.jpg)
Alaska Airlines C Terminal Apron Design Survey
During active airport operations, CRW surveyors provided an as-built of the existing striping, aboveground structures, jetways, and utilities for a...
VIEW PROJECT>
![Computer-generated view of Shotgun Cove Road extension](https://www.crweng.com/wp-content/uploads/2022/11/ShotgunCove3.gif)
Shotgun Cove Road Extension
The City of Whittier plans to extend Shotgun Cove Road 2.5 miles from its current terminus to Forest Service lands at Trinity...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/11/ImageReflection1.gif)
Image/Reflection Drive Area Road Reconstruction
High groundwater and poor soils caused failed storm drainpipes, heaving roadways, and increased maintenance efforts in this east Anchorage subdivision....
VIEW PROJECT>
![Photo of road and improved walking path](https://www.crweng.com/wp-content/uploads/2019/11/Talkeetna-Path.gif)
Parks Highway/Talkeetna Spur Road Pedestrian Improvements
The Alaska Department of Transportation & Public Facilities aimed to implement pedestrian improvements along the Parks Highway between Talkeetna Spur...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/umed.gif)
UMED Pedestrian & Transit Improvements
CRW provided planning and design of pedestrian and transit improvements along Providence Drive, including an analysis of transit stops, crosswalks,...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/FishCreek2-e1663267516696.gif)
AMATS Areawide Trails Rehabilitation, Fish Creek Trail
Rehabilitation of this mile-long section of trail to improve safety and connectivity involved the replacement of four pedestrian bridges, flood...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/GoldenView4.gif)
Golden View Drive Overlay
Improvements to bring this two-mile-long section of hillside road to Municipality of Anchorage collector standards and provide a safer road...
VIEW PROJECT>
![Quinhagak Sanitation Lagoon](https://www.crweng.com/wp-content/uploads/2019/12/KwinLagoon.gif)
Quinhagak Sanitation Improvements
CRW provided the planning, design, permitting, and construction management services for both the wastewater collection and treatment systems. The wastewater...
VIEW PROJECT>
![Photo of Anchorage pump station](https://www.crweng.com/wp-content/uploads/2022/09/PS54.gif)
Anchorage Water & Wastewater Utility Pump Station 54
AWWU's Pump Station 54 experienced numerous maintenance issues including pump faults and check valve failures. CRW evaluated the facility and...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/09/PS52d.gif)
Anchorage Water & Wastewater Utility Pump Station 52
This pump station, originally constructed in 1982, was upgraded in 2008 with new piping, pumps, valves, lift station top slab,...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/Whittier.gif)
Whittier Harbor Utilities
CRW designed sewer upgrades in Whittier's boat harbor area. The improvements included new sewer mains and manholes and two wastewater...
VIEW PROJECT>
![Seldovia WS Improvements](https://www.crweng.com/wp-content/uploads/2019/11/013-WW04-Seldovia-WS-Imp-092708-SOV-270-TO-STA-820-009.jpg)
Seldovia Water & Sewer Improvements
CRW designed and managed the construction of water and sewer improvements for the City of Seldovia. The project included trenchless...
VIEW PROJECT>
![Mt-Pt-WWTP](https://www.crweng.com/wp-content/uploads/2019/11/013-WW03-Mt-Pt-WWTP.jpg)
Mountain Point Wastewater Treatment Plant
CRW designed a secondary wastewater treatment plant for a peak capacity of 1.0 million gallons per day (MGD) and expansion...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/PS53b.gif)
Anchorage Water & Wastewater Utility Lift Stations Upgrades
CRW provided civil and electrical design services to Anchorage Water and Wastewater Utility for upgrading five wastewater lift stations in...
VIEW PROJECT>
![LKSD-Bethel-Utilidor](https://www.crweng.com/wp-content/uploads/2019/11/013-WW01-LKSD-Bethel-Utilidor.jpg)
Lower Kuskokwim School District Bethel Campus Utilidor Upgrades
CRW provided design, bidding, and construction administration for this fast-tracked utility project, which replaced aging water, sewer, add-heat, and fire...
VIEW PROJECT>
![Photo of Sitka critical secondary water project.](https://www.crweng.com/wp-content/uploads/2023/03/20220621_075322-scaled.jpg)
Sitka Critical Secondary Water Supply
CRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2022/09/92AvePRV-e1663262213401.gif)
Anchorage Water & Wastewater Utility 92nd Avenue PRV Facility
CRW provided design for AWWU’s new PRV facility that extended the 347 Pressure Zone (PZ) to the west and closer...
VIEW PROJECT>
![Quinhagak WS Project](https://www.crweng.com/wp-content/uploads/2019/11/014-WA05-Quinhagak-WS-Project.jpg)
Quinhagak Water & Sewer Project
This multi‐year, multi‐phase project brought much-needed sanitation infrastructure to the community of Quinhagak. CRW provided design and construction management of...
VIEW PROJECT>
![](https://www.crweng.com/wp-content/uploads/2019/11/WonderPark.gif)
Anchorage Water & Wastewater Utility Wonder Park Water & Sewer Phase II
CRW evaluated the condition of the Wonder Park Subdivision utilities and provided design documents to replace 2,600 feet of severely...
VIEW PROJECT>
![N Seward WST](https://www.crweng.com/wp-content/uploads/2019/11/014-WA02-N-Seward-WST.jpg)
North Seward Water Storage Tank & Pumping Facility
CRW provided design for 8,500 feet of water main, a Class A public water well, 500,000-gallon insulated water storage tank,...
VIEW PROJECT>
![Water-Seldovia WTP](https://www.crweng.com/wp-content/uploads/2019/11/014-WA01-Water-Seldovia-WTP.jpg)
Seldovia Water Treatment Plant
Design and permitting was provided for a new, pressure filtration water treatment plant, capable of producing up to 400,000 gallons...