
Office of Aviation Services Hangar
CRW provided civil and structural design for a new 20,000 sf aviation hangar and a 9,000 sf weather shelter hangar....
VIEW PROJECT>

Lake Hood Alpha-Bravo
The Lake Hood Seaplane Base A and B general aviation aircraft parking areas were rehabilitated, including new asphalt surfacing over...
VIEW PROJECT>

Merrill Field Runway 5-23 Lighting
This project provided runway lighting for the gravel/ski strip 5-23, edge lighting for Taxiways T and G, power regulator upgrades,...
VIEW PROJECT>

Alaska Airlines Hangar
Site and utility design were provided for the construction of a new, 60,000-square-foot maintenance hangar for Alaska Airlines. The site...
VIEW PROJECT>

Lake Hood Lakeshore Taxilane
This project rehabilitated 1,900 feet of taxiway at Lake Hood Seaplane Base. The improvements included new pavement structural sections, ditching,...
VIEW PROJECT>

Merrill Field Taxiways G & Q, Phases 5, 6 & 7
This fast-paced reconstruction of Taxiways G and Q and the Golf East and Quebec Aprons included new structural sections, pavement,...
VIEW PROJECT>

Anchorage International Airport Taxiway F
Reconstructed to FAA standards, the Taxiway F improvements included a new structural section; shoulder paving; and the replacement of lighting,...
VIEW PROJECT>

Lake Hood Taxiway V
These improvements brought Taxiway V into conformance with the Airport Layout Plan's ultimate designation and included structural section replacement, shoulder...
VIEW PROJECT>
Northern Lights Boulevard Chester Creek Culvert
The Chester Creek culvert underneath Northern Lights Blvd failed during the winter of 2020. As a fast paced, emergency repair...
VIEW PROJECT>
Emmonak Water & Sewer System Improvements
Working directly for the City of Emmonak, CRW provided planning, surveying, design, permitting, and construction administration services for upgrades to...
VIEW PROJECT>
Rampart Wastewater Lagoon Improvements
CRW provided construction administration services for wastewater lagoon upgrades in Rampart, Alaska. The project included the construction of a new...
VIEW PROJECT>
Sitka Critical Secondary Water Supply
CRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...
VIEW PROJECT>
Quinhagak Water & Sewer Project
This multi-year project included managing budgets, schedules, workforce, and procurement activities. Almost every type of utility construction project was involved:...
VIEW PROJECT>
Seldovia Water Treatment Plant
As the Engineer of Record, CRW provided years of construction management services. Tasks included managing budgets, schedules, workforce, and procurement...
VIEW PROJECT>
Merrill Field Airport Capital Improvements
CRW provided construction administration and daily on-site field inspection services of the dynamic compaction of the old landfill below Merrill...
VIEW PROJECT>
Eagle River Wastewater Treatment Facility Rehab – Phase II
Full-time construction management and on-site field inspection services were provided by CRW. Our personnel met daily with Anchorage Water and...
VIEW PROJECT>
Eklutna Water Treatment Facility Upgrades
The entire 30-year-old primary electrical supply for the main water source was replaced preemptively before it became an emergency. The...
VIEW PROJECT>
CITY & BOROUGH OF SITKA CRITICAL SECONDARY WATER SUPPLY PROJECT
This project included the design of a new water intake and 6 MGD water treatment plant (WTP). The new WTP...
VIEW PROJECT>
C Street Phase 2 Electrical Engineering
CRW provided the electrical engineering design for the C Street and 7th Avenue Transit Phase 2 project. The design included pedestrian light pole...
VIEW PROJECT>
Anchorage Water & Wastewater Utility PRV Rehabilitation Projects
CRW prepared design documents to upgrade existing pressure reducing valve facilities for Anchorage Water and Wastewater Utility. Facility systems were...
VIEW PROJECT>
Bethel Wind Turbine
CRW was selected to design and permit a 900-kilowatt, grid-connected wind turbine in Bethel. Our responsibilities included the review and...
VIEW PROJECT>
Seldovia Water Treatment Plant
Power, lighting, and controls were designed for a new greensand filtration system. The power feed was extended several thousand feet...
VIEW PROJECT>
Palmer Wastewater Treatment Plant
CRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...
VIEW PROJECT>
Togiak Energy System Upgrade
The existing, 30-year-old energy infrastructure had exceeded its useful design life. The power plant was replaced with a pre-engineered metal...
VIEW PROJECT>
St. Mary’s Energy System Upgrade
This project includes planning, design, and construction support services for a new tank farm and power plant facility. The work...
VIEW PROJECT>
Pilot Station Energy System Upgrade
Existing facilities were located on the bank of the Yukon River and subject to flooding. This multi-faceted project relocated the...
VIEW PROJECT>
Teller Energy System Upgrade
A new modularized power plant with a heat recovery system and 110,000-gallon, bulk fuel tank farm were constructed on a...
VIEW PROJECT>
Sitka Critical Secondary Water Supply
CRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...
VIEW PROJECT>
Arctic Village Water Treatment Plant & Washeteria
CRW provided planning, a pilot study, and design for a new, fill and draw, water treatment plant and washeteria. The...
VIEW PROJECT>
Mertarvik Water & Sewer Design
The Mertarvik site is being constructed to relocate Newtok residents who are in danger of losing their community due to...
VIEW PROJECT>
Quinhagak Water & Sewer Project
The services provided by CRW included analysis, testing, design, and construction of the community water source, consisting of three slant...
VIEW PROJECT>
Napaskiak Water Treatment Plant Upgrades
The public water utility treats water at two water treatment plants from two separate groundwater sources. To remove iron and...
VIEW PROJECT>
Unalakleet Public Water System
The public water system contained elevated levels of organics and had limited capacity to meet summer water demands. Upgrades included...
VIEW PROJECT>
Seldovia Water Treatment Plant
CRW completed the design, permitting, force account construction management, and start-up for a new water treatment plant, which treats the...
VIEW PROJECT>
US Army Corps of Engineers JBER Building 8517 Earthquake Repair
This 160,000 SF 1950’s “People Center” located on Joint Base Elmendorf Richardson (JBER) was damaged by the Alaska magnitude 7.1...
VIEW PROJECT>
US Customs and Border Protection Canine Kennel
CRW provided structural, mechanical, electrical, and civil engineering services to assist the contractor in designing a new 10 kennel canine...
VIEW PROJECT>
United States Coast Guard (USCG) Kodiak Wastewater Treatment Facility (WWTF)
This project involves two phases. The first phase evaluates existing wastewater treatment plant/process/operations and the lift stations conveying wastewater to...
VIEW PROJECT>
Federal Aviation Administration Fairbanks Automated Flight Service Station (AFSS)
This project includes engineering design services for a new 40-foot by 30-foot, single-story metal building at the AFSS in Fairbanks,...
VIEW PROJECT>
United States Air Force (USAF) Sparrevohn Long Range Radar Site
CRW provided design, construction administration, and commissioning services for this design-build bulk fuel project for the USAF at the Sparrevohn...
VIEW PROJECT>
Victor Creek Temporary Bridge
CRW provided axial and lateral pile design for a temporary bridge crossing Victor Creek as part of the Alaska Department...
VIEW PROJECT>
Valdez Container Terminal (VCT) Water Main Replacement
CRW performed a geotechnical investigation to support CRW’s design for a replacement water main on the island and causeway. The...
VIEW PROJECT>
UAA AV-Tech Building Earthquake Repairs
CRW provided geotechnical support throughout the investigation and design of building and apron repairs due to the November 2018 Alaska...
VIEW PROJECT>
Kotzebue AC Store
CRW performed a geotechnical investigation to support site development and foundation design for a new Alaska Commercial (AC) Store in...
VIEW PROJECT>
King Cove Solid Waste Services
CRW performed a geotechnical investigation to support site development and design for a new solid waste processing facility in King...
VIEW PROJECT>
Geotechnical Investigation in Support of Horizontal Directional Drilling Design for a Private Development at ANC
CRW planned and oversaw a geotechnical investigation to support the design of a buried fuel pipeline to be installed by...
VIEW PROJECT>
Rampart Sewage Lagoon
A geotechnical investigation was performed to support CRW’s design of a new sewage lagoon for the community of Rampart. The...
VIEW PROJECT>
Anchorage International Airport Taxiway Y Slope Repair
CRW oversaw cone penetration testing (CPT) to investigate a shallow slide failure due to the November 2018, southcentral Alaska, magnitude...
VIEW PROJECT>
82nd Ave Pump Station
CRW provided project management, design, and construction support services for the design of the 82nd Avenue lift station. CRW services included...
VIEW PROJECT>
Crawford Street Area Drainage Improvements
Design of a replacement stormwater lift station, controls, and force main in West Anchorage, replacing a 30 year old existing...
VIEW PROJECT>
Northern Lights Boulevard Chester Creek Culvert
The Chester Creek culvert underneath Northern Lights Blvd failed during the winter of 2020. As a fast paced, emergency repair...
VIEW PROJECT>
Meadow Creek at Old Eagle River Road
Continual flooding in this project area was due to an undersized culver. A larger box culvert was installed to pass...
VIEW PROJECT>
35th Avenue & McRae Road Improvements
CRW worked with the Municipality of Anchorage to upgrade this 4,000-foot-long, neighborhood collector roadway located in west Anchorage. The project...
VIEW PROJECT>
Golden View Drive Upgrade
Improvements to bring this two-mile-long section of hillside road to Municipality of Anchorage collector standards and provide a safer road...
VIEW PROJECT>
Chester Creek Culvert Replacement at Providence Drive
Two existing 78-inch-diameter corrugated metal pipe culverts that conveyed fish passage of Chester Creek beneath Providence Drive were replaced with...
VIEW PROJECT>
AMATS: Areawide Trails Rehab, Fish Creek Trail
Rehabilitation of this mile-long section of trail to improve safety and connectivity included replacement of four pedestrian bridges, installation of...
VIEW PROJECT>
King Cove Solid Waste Processing Facility
CRW assisted the City of King Cove with a new Solid Waste Processing Facility. The project included surveying, developing an...
VIEW PROJECT>
Matanuska-Susitna Borough Central Landfill Survey
Under term contract with the Matanuska-Susitna Borough, CRW is providing surveying services to support the Solid Waste Division’s operations at...
VIEW PROJECT>
Eek Landfill
Design and construction administration services were provided for a new Class III landfill facility and closure of the existing dump....
VIEW PROJECT>
Biomass Boiler Design
CRW provided mechanical and electrical engineering design, which will serve multiple buildings. This extreme winter temperature design will provide an...
VIEW PROJECT>
Mears Middle School Roof Replacement
For this multi-phase renovation project CRW provided mechanical and electrical design and construction administration services to upgrade the roof and...
VIEW PROJECT>
North Slope Borough Transit Wash Bay Upgrade
CRW provided design services to incorporate a new bus wash, water recycle/reclaim system, and commercial vacuums into the existing wash...
VIEW PROJECT>
Heat Recovery Projects
CRW designed more than a dozen heat recovery projects for communities throughout western and interior Alaska. These heat recovery systems...
VIEW PROJECT>
Anchorage Water & Wastewater Utility 92nd Avenue PRV Facility
Mechanical work for this new facility involved heating and ventilation, and layout of the 12-inch and 16-inch water piping and...
VIEW PROJECT>
US Air Force Diesel Fuel Bulk Storage Replacement
This project included six, 37,500-gallon, aboveground storage tanks; an enclosure for fuel offloading; and a control building. Design of heating...
VIEW PROJECT>
Rogers Park Elementary School Roof & HVAC Upgrades
CRW co-primed this multi-phase renovation project, which included systems upgrades to the roof drainage, domestic piping, and HVAC to provide...
VIEW PROJECT>
Palmer Wastewater Treatment Plant
CRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...
VIEW PROJECT>
Kivalina Relocation Master Plan
CRW is preparing the community Master Plan for Kivalina in support of the community’s expansion to K-Hill. The Master Plan...
VIEW PROJECT>
Native Village of Eyak (NVE) Housing Master Plan
CRW is assisting the NVE with the development of a Housing Master Plan in Cordova. The NVE and the City...
VIEW PROJECT>
Department of Transportation & Public Facilities Copper River Highway Transportation Master Plan
CRW is supporting the Alaska Department of Transportation & Public Facilities (DOT&PF) and the Native Village of Eyak in developing...
VIEW PROJECT>
Seldovia Water Treatment Plant
CRW completed the design, permitting, force account construction management, and start-up for a new water treatment plant, which treats the...
VIEW PROJECT>
Eek Landfill
Design and construction administration services were provided for a new Class III landfill facility and closure of the existing dump....
VIEW PROJECT>
Kipnuk Boardwalk Improvements
Many rural communities use extensive boardwalk networks for mobile transportation, especially during the summer and fall seasons when the moist...
VIEW PROJECT>
Unalakleet Lagoon Rehabilitation
The project upgrades involved removing over 30 years of sludge buildup and installing two, 30,000-gallon septic tanks to limit future...
VIEW PROJECT>
Quinhagak Piped Water & Sewer System
CRW has worked successfully for 17 years on sanitation and infrastructure improvements. The long-term goal is to develop sustainable facilities...
VIEW PROJECT>
Arctic Village Water Treatment Plant & Washeteria
CRW provided planning, design, permitting, surveying, and force account construction management services for a new water treatment plant and washeteria...
VIEW PROJECT>
Medline Warehouse
CRW provided survey, geotechnical, and civil design on this design-build project that involved construction of a 149,000 sf, multi-story warehouse on...
VIEW PROJECT>
Prince William Sound Science Center
CRW provided civil and structural engineering services for the Prince William Sound Science Center, consisting of a main building and...
VIEW PROJECT>

Office of Aviation Services Hangar
CRW provided civil and structural design for a new 20,000 sf aviation hangar and a 9,000 sf weather shelter hangar....
VIEW PROJECT>
Huffman Elementary School Upgrades
CRW developed an inspection checklist to assess existing site conditions and to assist with designing recommended improvements. Traffic circulation and...
VIEW PROJECT>
Anchorage Football Stadium Improvements
This project featured an innovative type of artificial turf surfacing that looks and plays like real grass, a new track...
VIEW PROJECT>
Susitna Flats Housing
This multi-phase project began with determining the feasibility of developing the west end of the Park Strip. The site was...
VIEW PROJECT>

Alaska Airlines Hangar
Land surveying, civil, and site design were provided for a new Alaska Airlines hangar. The project successfully overcame the challenges...
VIEW PROJECT>
ML&P Plant 2 Expansion
Civil planning, design, and construction management services were provided on this design/build power plant expansion project, including surveying, retaining wall...
VIEW PROJECT>
Aloft Hotel
The new Aloft Hotel is Anchorage’s newest boutique hotel. The four-story, 146 room, wood framed hotel is approximately 80,300 square-foot...
VIEW PROJECT>
Prince William Sound Science Center
This fast-tracked, Design-Build project entailed design for a new two-story, 24,000 square-foot science center. Shortly after award in January of...
VIEW PROJECT>
US Army Corps of Engineers JBER Building 8517 Earthquake Repair
This 160,000 SF 1950’s “People Center” located on Joint Base Elmendorf Richardson (JBER) was damaged by the Alaska magnitude 7.1...
VIEW PROJECT>
US Air Force Diesel Fuel Bulk Storage Replacement
Structural, civil, mechanical, and electrical engineering was provided for the replacement of an existing tank farm. The project consisted of...
VIEW PROJECT>
Palmer Wastewater Treatment Plant
CRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...
VIEW PROJECT>
Arctic Village Water Treatment Plant & Washeteria
CRW provided the structural and civil engineering, and process design for a new, 2,250-square-foot, water treatment facility and washeteria. The...
VIEW PROJECT>
Shotgun Cove Road Extension
The City of Whittier plans to extend Shotgun Cove Road 2.5 miles from its current terminus to Forest Service lands at Trinity...
VIEW PROJECT>
Valdez Container Terminal Water Main Replacement
The Valdez Container Terminal is the state's fourth-largest port in terms of volume and plays a crucial role in serving the community...
VIEW PROJECT>
Matanuska-Susitna Borough Central Landfill Survey
Under term contract with the Matanuska-Susitna Borough, CRW is providing surveying services to support the Solid Waste Division’s operations at...
VIEW PROJECT>
Whittier City Park Master Plan, Unmanned Aerial Vehicle (UAV) 3D Modeling
Using a survey-grade Leica unmanned aerial vehicle, CRW provided high-resolution aerial photography and a 3D point cloud for the planning...
VIEW PROJECT>
Kipnuk Boardwalk Improvements Vertical Survey Control
CRW's survey group provided the survey control, topographic survey, and as-builts of the existing boardwalk and structures for the design...
VIEW PROJECT>
Alaska State Land Subdivision Plat Boundary Survey
Surveying, mapping, and platting were provided for bulk fuel storage tanks for the community of Edna Bay. The plat subdivided...
VIEW PROJECT>
Point Woronzof Wastewater Treatment Facility Hydrographic Survey
Due to tidal erosion around the Anchorage Water and Wastewater Utility effluent tower, a new erosion-control structure was constructed around...
VIEW PROJECT>
Alaska Airlines C Terminal Apron Design Survey
During active airport operations, CRW surveyors provided an as-built of the existing striping, aboveground structures, jetways, and utilities for a...
VIEW PROJECT>
Shotgun Cove Road Extension
The City of Whittier plans to extend Shotgun Cove Road 2.5 miles from its current terminus to Forest Service lands at Trinity...
VIEW PROJECT>
Image/Reflection Drive Area Road Reconstruction
High groundwater and poor soils caused failed storm drainpipes, heaving roadways, and increased maintenance efforts in this east Anchorage subdivision....
VIEW PROJECT>
Parks Highway/Talkeetna Spur Road Pedestrian Improvements
The Alaska Department of Transportation & Public Facilities aimed to implement pedestrian improvements along the Parks Highway between Talkeetna Spur...
VIEW PROJECT>
UMED Pedestrian & Transit Improvements
CRW provided planning and design of pedestrian and transit improvements along Providence Drive, including an analysis of transit stops, crosswalks,...
VIEW PROJECT>
AMATS Areawide Trails Rehabilitation, Fish Creek Trail
Rehabilitation of this mile-long section of trail to improve safety and connectivity involved the replacement of four pedestrian bridges, flood...
VIEW PROJECT>
Golden View Drive Overlay
Improvements to bring this two-mile-long section of hillside road to Municipality of Anchorage collector standards and provide a safer road...
VIEW PROJECT>
Quinhagak Sanitation Improvements
CRW provided the planning, design, permitting, and construction management services for both the wastewater collection and treatment systems. The wastewater...
VIEW PROJECT>
Anchorage Water & Wastewater Utility Pump Station 54
AWWU's Pump Station 54 experienced numerous maintenance issues including pump faults and check valve failures. CRW evaluated the facility and...
VIEW PROJECT>
Anchorage Water & Wastewater Utility Pump Station 52
This pump station, originally constructed in 1982, was upgraded in 2008 with new piping, pumps, valves, lift station top slab,...
VIEW PROJECT>
Whittier Harbor Utilities
CRW designed sewer upgrades in Whittier's boat harbor area. The improvements included new sewer mains and manholes and two wastewater...
VIEW PROJECT>
Seldovia Water & Sewer Improvements
CRW designed and managed the construction of water and sewer improvements for the City of Seldovia. The project included trenchless...
VIEW PROJECT>
Mountain Point Wastewater Treatment Plant
CRW designed a secondary wastewater treatment plant for a peak capacity of 1.0 million gallons per day (MGD) and expansion...
VIEW PROJECT>
Anchorage Water & Wastewater Utility Lift Stations Upgrades
CRW provided civil and electrical design services to Anchorage Water and Wastewater Utility for upgrading five wastewater lift stations in...
VIEW PROJECT>
Lower Kuskokwim School District Bethel Campus Utilidor Upgrades
CRW provided design, bidding, and construction administration for this fast-tracked utility project, which replaced aging water, sewer, add-heat, and fire...
VIEW PROJECT>
Sitka Critical Secondary Water Supply
CRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...
VIEW PROJECT>
Anchorage Water & Wastewater Utility 92nd Avenue PRV Facility
CRW provided design for AWWU’s new PRV facility that extended the 347 Pressure Zone (PZ) to the west and closer...
VIEW PROJECT>
Quinhagak Water & Sewer Project
This multi‐year, multi‐phase project brought much-needed sanitation infrastructure to the community of Quinhagak. CRW provided design and construction management of...
VIEW PROJECT>
Anchorage Water & Wastewater Utility Wonder Park Water & Sewer Phase II
CRW evaluated the condition of the Wonder Park Subdivision utilities and provided design documents to replace 2,600 feet of severely...
VIEW PROJECT>
North Seward Water Storage Tank & Pumping Facility
CRW provided design for 8,500 feet of water main, a Class A public water well, 500,000-gallon insulated water storage tank,...
VIEW PROJECT>
Seldovia Water Treatment Plant
Design and permitting was provided for a new, pressure filtration water treatment plant, capable of producing up to 400,000 gallons...
VIEW PROJECT>