ANC Runway 7R/25L Pavement Repairs
Location: ANC, Anchorage, AK
CRW provided design, bidding and construction assistance for repairing the asphalt pavement within RW 7R from the end of the asphalt repairs performed in 2022. Design consisted of milling and repaving 3” of asphalt approximately 20’ wide either side of centerline and installing new striping.