Lake Hood Taxiway V

Location: Lake Hood/ANC

These improvements brought Taxiway V into conformance with the Airport Layout Plan’s ultimate designation and included structural section replacement, shoulder paving, drainage, aircraft lighting, signing, and striping upgrades. The project also involved realigning West Tug Road, safety improvements to the Postmark Drive/Taxiway V intersection, and replacing the taxiway lighting circuit to the airfield lighting vault.