Palmer Wastewater Treatment Plant

Location: Palmer, AK

CRW provided the structural engineering for various buried concrete tanks for the wastewater treatment plant including the moving bed biofilm reactor, two circular clarifiers, a sludge pumping vault, and other site structures. The tanks were designed as “watertight” environmental structures in accordance with ACI 350, with depths ranging from 13 to 25 feet below grade and requiring technical concreting methods.