Location: Bethel, AK

CRW was selected to design and permit a 900-kilowatt, grid-connected wind turbine in Bethel. Our responsibilities included the review and coordination of existing information, an evaluation of potential sites, design of the access road, site plan and power distribution system upgrades, permitting, and project management.
LKSD-Bethel-Utilidor

Location: Bethel, AK

CRW provided design, bidding, and construction administration for this fast-tracked utility project, which replaced aging water, sewer, add-heat, and fire protection pipelines within the Lower Kuskokwim School District Bethel Campus utilidor system. The project also included structural and mechanical design of a new heated utilidor, lift station, and 2,000 linear feet of arctic water and sewer lines.