Location: Utqiagvik, AK
CRW provided design services to incorporate a new bus wash, water recycle/reclaim system, and commercial vacuums into the existing wash bay of the Transit Building. The project successfully upgraded the wash bay within the limited space. The design also included a dry-side vacuum and air freshener side, and was designed for operation during extreme winter temperatures.![NSB Transit Wash Bay Water Recycle Reclaim](https://www.crweng.com/wp-content/uploads/2019/11/007-ME05-NSB-Transit-Wash-Bay-Water-Recycle-Reclaim-150x150.jpg)