Location: Teller, AK
A new modularized power plant with a heat recovery system and 110,000-gallon, bulk fuel tank farm were constructed on a small footprint due to limited land availability. Construction was phased to allow the existing power plant to remain online until the new module was energized.![project in Teller, AK](https://www.crweng.com/wp-content/uploads/2019/11/004-EN01-Teller-150x150.jpg)