project in Teller, AK

Location: Teller, AK

A new modularized power plant with a heat recovery system and 110,000-gallon, bulk fuel tank farm were constructed on a small footprint due to limited land availability. Construction was phased to allow the existing power plant to remain online until the new module was energized.