Location: Eklutna, AK
The entire 30-year-old primary electrical supply for the main water source was replaced preemptively before it became an emergency. The facility remained operational during construction. Existing circuits were abandoned and the utility’s energy recovery turbine feeder was rerouted, voltage lowered, and controls relocated to a single location outside the facility.