Eklutna Water Treatment Facility Primary Upgrades

Location: Eklutna, AK

The entire 30-year-old primary electrical supply for Anchorage’s main water source at the Eklutna Water Treatment Facility was replaced preemptively before it became an emergency. Existing circuits were abandoned and the utility’s energy recovery turbine feeder was rerouted, voltage lowered, and controls relocated to a single location outside the facility. The design allowed the plant to operate at full capacity with redundant backup power during construction.