Anchorage Water & Wastewater Utility PRV Vault Rehabilitation Project

Location: Anchorage, AK

CRW prepared design documents to upgrade eleven, existing pressure reducing valve facilities for Anchorage Water Wastewater Utility. Facility systems were upgraded to meet current code requirements, the water distribution system was simplified and optimized through pressure zone consolidation, SCADA enhancements were provided, and operations and maintenance costs were reduced.